Discover
Discover
Students will launch the NYC bin overflow project by examining a realistic sanitation problem, gathering initial evidence from multiple perspectives, and defining who is most affected. They will use brief data displays, observation cues, and structured peer feedback to produce a challenge statement, an end-user profile, and inquiry questions that guide later research, modeling, and prototype design.
Days 1 - 2
Engineer
Engineer
Students will use bin-fill data, user needs, and rapid prototyping to design a sensor-based trash bin monitoring solution, write a testable prediction, plan their build, create and revise an early prototype, and document how mathematical models and feedback shaped their design choices.
Days 12 - 17
Do
Do
Students will implement their sensor-based bin monitoring prototypes in a short trial, collect and analyze evidence, compare predicted and observed bin-fill patterns, and document how test results lead to a concrete design improvement before the final public sharing phase.
Days 18 - 19
Discover
Days 1–2
Examine
Days 3–11
Engineer
Days 12–17
Day 16
Do
Days 18–19
Share
Days 20–20
July 2026
Mon
Tue
Wed
Thu
Fri
28
Day 2
π§ Challenge Definition
π§ Challenge Definition
30
Day 4
π Source Evaluation Report
π Source Evaluation Report
31
Day 5
π Bin-Fill Tables to Functions
π Bin-Fill Tables to Functions
August 2026
Mon
Tue
Wed
Thu
Fri
3
Day 6
π» Graph Shifts for Pickup Timing
π» Graph Shifts for Pickup Timing
4
Day 7
π€ DSNY and Robotics Question Exchange
π€ DSNY and Robotics Question Exchange
5
Day 8
π§© Root Cause Analysis
π§© Root Cause Analysis
6
Day 9
π Model Fit Feedback Round
π Model Fit Feedback Round
7
Day 10
π§ͺ Sensor Variable Test Sketches
π§ͺ Sensor Variable Test Sketches
10
Day 11
π Solution Proposal
π Solution Proposal
12
Day 13
π Exemplar Exploration
π Exemplar Exploration
13
Day 14
π οΈ Sensor Build Flow
π οΈ Sensor Build Flow
ποΈ Creation Plan
ποΈ Creation Plan
14
Day 15
π€ Prototype Trial Round
π€ Prototype Trial Round
17
Day 16
18
Day 17
π Solution Development Report
π Solution Development Report
19
Day 18
Do
πΊοΈ Implementation and Data Collection Plan
πΊοΈ Implementation and Data Collection Plan
20
Day 19
π Implementation Results
π Implementation Results