Deliverable
🧪 Hypothesis
Testing variables
Collecting data
AI-F.BF.1
AI-F.LE.2
Submission Required
Grading Required
Each team writes a testable prediction for one design change in its bin monitor system, such as sensor placement, alert threshold, or sampling interval. The hypothesis must use an 'If..., then...' structure tied to a measurable outcome from bin-fill data, overflow timing, or alert accuracy. Teams identify the independent variable, dependent variable, and how they will collect evidence during testing.
Plan day
Day 12
Duration
35 min
Grouping
Small Group
Steps
—