July 2026

Mon
Tue
Wed
Thu
Fri
27 Day 1
Empathize
Nature Walk to Observe Tortoise Habitats Nature Walk to Observe Tortoise Habitats
Meet Park Stakeholders Meet Park Stakeholders
28 Day 2
29 Day 3
Synthesize Field Observations into Problem Synthesize Field Observations into Problem
30 Day 4
Define
Frame Tortoise Habitat Problem (90 min) Frame Tortoise Habitat Problem (90 min)

August 2026

Mon
Tue
Wed
Thu
Fri
3 Day 5
From Observation to Tortoise Enclosure Sketches From Observation to Tortoise Enclosure Sketches
4 Day 6
Prototype Planning: Layouts and Materials Prototype Planning: Layouts and Materials
5 Day 7
Ideate
Tortoise Enclosure Concepts (60 min) Tortoise Enclosure Concepts (60 min)
6 Day 8
Creating Low-Fidelity Enclosure Layout Sketches Creating Low-Fidelity Enclosure Layout Sketches
10 Day 9
Peer Review of Enclosure Design Plans Peer Review of Enclosure Design Plans
11 Day 10
Material Feasibility and Safety Planning Material Feasibility and Safety Planning
12 Day 11
Prototype
Low-Fidelity Tort Enclosure Low-Fidelity Tort Enclosure
13 Day 12
Collaborative Peer Design Review Workshop Collaborative Peer Design Review Workshop
17 Day 13
Materials, Safety, and Sustainability Audit Materials, Safety, and Sustainability Audit
18 Day 14
Comprehensive Tortoise Habitat Requirements Mapping Comprehensive Tortoise Habitat Requirements Mapping
19 Day 15
Scaled Model or Digital Mock-up Build Scaled Model or Digital Mock-up Build
20 Day 16
Test/Present
Expo Q&A Practice and Reflective Revision Expo Q&A Practice and Reflective Revision
24 Day 17
From Field Observations to Design Specs From Field Observations to Design Specs
25 Day 18
Develop Construction Drawings and Materials List Develop Construction Drawings and Materials List
26 Day 19
Peer Review and Design Refinement Peer Review and Design Refinement
27 Day 20
Tortoise Habitat Expo Tortoise Habitat Expo