Ideate
Ideate
Students will generate a wide range of visual and textile design concepts for their Heritage Story Textile and Collaborative Quilt, using structured ideation strategies grounded in user interview evidence. They will move from divergent brainstorming to evidence-based selection, producing annotated concept sketches and a user-centered storyboard that will guide Phase 4 prototyping.
Days 7 - 10
Prototype
Prototype
Students will build and refine embroidered prototype panels that translate user research into symbolic visual narratives, test their designs with real users, and document feedback-driven revisions before constructing higher-fidelity stitched sections for their Heritage Story Textile and collaborative quilt.
Days 11 - 15
Test/Present
Test/Present
Students will conduct a final validation round of their embroidered heritage panels and collaborative quilt with new users, refine their work based on documented feedback, and present their full design journeyโfrom empathy interviews to final textileโat the Threads of Heritage Festival.
Days 16 - 20
Empathize
Days 1–3
Day 1
๐ Heritage Kickoff Fiesta & Story Circle
Launch
45m
Day 2
๐ฃ๏ธ Bilingual Interview Skills Workshop
Knowledge/Skill Building
45m
Day 3
๐ง Empathy Map from Real Interviews
Deliverable
45m
Define
Days 4–6
Day 4
๐ง Affinity Mapping Heritage Quotes
Knowledge/Skill Building
45m
Day 5
โ๐ฝ Point-of-View & HMW Workshop
Knowledge/Skill Building
45m
Day 6
๐ชก Heritage Design Brief
Deliverable
45m
Ideate
Days 7–10
Day 7
๐ง 20 Heritage Imagery Brainstorm
Deliverable
45m
Day 8
โ๏ธ Crazy 8s Stitch Concepts
Deliverable
45m
Day 9
๐ User-Need Decision Matrix
Knowledge/Skill Building
45m
Day 10
๐ผ๏ธ Annotated Concept Storyboard
Deliverable
45m
Prototype
Days 11–15
Day 11
๐งต Stitch Sampling for Symbolism
Knowledge/Skill Building
45m
Day 12
โ๏ธ Paper Panel Prototype Draft
Deliverable
45m
Day 13
๐ชก First Stitched Section Build
Project Work
45m
Day 14
๐ฃ๏ธ User Feedback & Revision Log
Deliverable
45m
Day 15
๐งถ Revised High-Fidelity Panel Section
Assessment
45m
Test/Present
Days 16–20
Day 16
๐งช New User Quilt Testing
Project Work
45m
Day 17
๐ชก Final Stitch & Statement Revisions
Deliverable
45m
Day 18
๐ค Design Story Rehearsal Round
Knowledge/Skill Building
45m
Day 19
๐ผ๏ธ Threads of Heritage Festival
Assessment
45m
Day 20
๐ Design Impact Reflection
Deliverable
45m
May 2026
Mon
Tue
Wed
Thu
Fri
4
Day 1
Empathize
๐ Heritage Kickoff Fiesta & Story Circle
5
Day 2
๐ฃ๏ธ Bilingual Interview Skills Workshop
6
Day 3
๐ง Empathy Map from Real Interviews
7
Day 4
Define
๐ง Affinity Mapping Heritage Quotes
8
Day 5
โ๐ฝ Point-of-View & HMW Workshop
11
Day 6
๐ชก Heritage Design Brief
12
Day 7
Ideate
๐ง 20 Heritage Imagery Brainstorm
13
Day 8
โ๏ธ Crazy 8s Stitch Concepts
14
Day 9
๐ User-Need Decision Matrix
15
Day 10
๐ผ๏ธ Annotated Concept Storyboard
18
Day 11
Prototype
๐งต Stitch Sampling for Symbolism
19
Day 12
โ๏ธ Paper Panel Prototype Draft
20
Day 13
๐ชก First Stitched Section Build
21
Day 14
๐ฃ๏ธ User Feedback & Revision Log
22
Day 15
๐งถ Revised High-Fidelity Panel Section
25
Day 16
Test/Present
๐งช New User Quilt Testing
26
Day 17
๐ชก Final Stitch & Statement Revisions
27
Day 18
๐ค Design Story Rehearsal Round
28
Day 19
๐ผ๏ธ Threads of Heritage Festival
29
Day 20
๐ Design Impact Reflection