Launch
Students will launch the erosion project by noticing how wind and water change land in San Diego, observing a short hands-on demo, learning from a community expert connection, and creating an early engineering design notebook entry that names the problem, possible materials, and what a successful model should do.
Days 1 - 4
πŸ–ΌοΈ San Diego Erosion Gallery
Launch 20m
🌬️ Tray, Fan, Spray Test
Knowledge/Skill Building 20m
🌿 Parks Worker Material Talk
Community Experience 20m
πŸ““ First Model Plan Sketch
Deliverable 20m

Edit Phase

Loading...
Launch & Define
Students will connect erosion to San Diego places, define the design problem with simple criteria and constraints, study how existing materials help hold soil in place, and prepare a team design brief for an erosion-blocking model.
Days 5 - 9
πŸ“Έ San Diego Erosion Photo Hunt
Launch 20m
🌬️ Tray Tests With Fans
Knowledge/Skill Building 20m
🌿 Soil Holders Material Study
Knowledge/Skill Building 20m
πŸ“ Team Design Brief Cards
Deliverable 20m
πŸ”„ Feedback Round On Briefs
Assessment 20m

Edit Phase

Loading...
Compare Ideas
Students will compare erosion-control ideas, sketch multiple possible solutions, use evidence and feedback to improve their thinking, and choose a team design approach for the next build phase.
Days 10 - 14
πŸ–ΌοΈ San Diego Erosion Solution Sort
Knowledge/Skill Building 20m
✏️ Two Erosion Model Sketches
Deliverable 20m
πŸ—£οΈ Sketch Feedback and Revision
Knowledge/Skill Building 20m
πŸ“Š Team Design Choice Chart
Project Work 20m
βœ… Team Plan Checkpoint
Assessment 20m

Edit Phase

Loading...
Build & Prototype
Students will build a first erosion-control prototype, use simple wind or water tests to gather evidence, record before-and-after changes with drawings or photos, and use peer feedback to plan their next revision.
Days 15 - 19
🧱 Prototype San Diego Land Model
Project Work 20m
✏️ Shape Sketch and Test Plan
Knowledge/Skill Building 15m
πŸ’¨ Wind or Rain Fair Test
Knowledge/Skill Building 20m
πŸ“· Before-and-After Evidence Page
Deliverable 20m
πŸ—£οΈ Two-Peer Feedback Circle
Deliverable 20m

Edit Phase

Loading...
Revise & Retest
Students will study evidence from their first erosion tests, revise one feature of their model at a time, retest with the same wind or water procedures, and explain which changes helped keep soil from blowing or washing away.
Days 20 - 24
πŸ–ΌοΈ Before-and-After Test Talk
Knowledge/Skill Building 15m
✏️ Revision Sketch with Shape Notes
Deliverable 20m
πŸ› οΈ Rebuild with Mulch and Rocks
Project Work 20m
🌬️ Retest with Same Measures
Project Work 20m
πŸ“š Engineering Story Checkpoint
Assessment 20m

Edit Phase

Loading...
Showcase Solutions
Students will organize final evidence from their erosion-control work, rehearse short engineering explanations, give and receive peer feedback, make one last revision to their presentation materials, and share their model and test evidence during a Mini Model Challenge Day.
Days 25 - 29
πŸ–ΌοΈ Before-and-After Evidence Board
Deliverable 20m
πŸ—£οΈ Model Story Practice
Knowledge/Skill Building 15m
πŸ”„ Two-Peer Feedback Round
Project Work 20m
🌬️ Mini Model Challenge Day
Assessment 25m
✏️ Final Drawing Reflection
Assessment 20m

Edit Phase

Loading...
Showcase
Students will present their final erosion-control models, use evidence from wind and water testing to explain how their designs work, give and receive peer feedback, make a final revision, and reflect on how erosion affects San Diego places and people.
Days 30 - 33
πŸ–ΌοΈ Model Display Practice
Knowledge/Skill Building 20m
πŸ’¬ Two-Team Feedback Round
Deliverable 20m
🌿 Mini Model Challenge Share
Community Experience 20m
πŸ“˜ Erosion Story Reflection
Assessment 20m

Edit Phase

Loading...