Launch
Students will enter the bridge challenge through a hands-on flood relief simulation, begin using the bridge test scorecard, and identify the measurable criteria and constraints that will guide later research, concept generation, testing, and revision.
Days 1 - 2
🌊 Flood Relief Kickoff Lab
Launch 45m
πŸ“ Bridge Limits Design Brief
Knowledge/Skill Building 45m

Edit Phase

Loading...
Research & Plan
Students will investigate bridge needs for flood relief, study existing bridge approaches, and turn that evidence into a team design brief with measurable criteria, constraints, and an initial research-backed plan for later concept selection and prototyping.
Days 3 - 8
🌊 Flood Route Stakeholder Map
Knowledge/Skill Building 45m
πŸ“ Bridge Limits and Measures
Knowledge/Skill Building 45m
🧱 Bridge Types Evidence Hunt
Research 45m
πŸ“ Design Brief Draft
Deliverable 45m
πŸ’¬ Design Brief Peer Critique
Project Work 45m
βœ… Design Brief Gate Review
Assessment 45m

Edit Phase

Loading...
Decide & Prototype
Students will compare multiple bridge concepts with evidence, choose a design using a weighted decision matrix, and build a rapid prototype that is ready for controlled testing with the bridge scorecard.
Days 9 - 13
πŸ“Š Weighted Bridge Matrix
Knowledge/Skill Building 40m
✏️ Three Bridge Concept Set
Deliverable 45m
πŸ—£οΈ Concept Critique Carousel
Project Work 45m
βœ… Design Choice Conference
Assessment 40m
πŸ› οΈ Rapid Prototype Build
Project Work 45m

Edit Phase

Loading...
Test Revise & Showcase
Students will test bridge prototypes with a shared scorecard, analyze cargo load, span success, and cost efficiency across repeated trials, revise one design feature at a time, and prepare evidence-based explanations of how their bridge improved and where limits remain.
Days 14 - 18
πŸ“ Bridge Test Protocol Rehearsal
Knowledge/Skill Building 35m
πŸ§ͺ Trial 1 Scorecard Run
Project Work 45m
πŸ”§ Failure Analysis and Revision Plan
Knowledge/Skill Building 45m
πŸ” Trial 2 Retest and Comparison
Project Work 45m
πŸ—‚οΈ Expo Evidence Board Draft
Deliverable 45m

Edit Phase

Loading...
Showcase
Students will present their tested flood relief bridge models to an authentic audience, use scorecard evidence and design artifacts to justify engineering decisions, and reflect on how repeated testing and revision improved performance under constraints.
Days 19 - 20
πŸ› οΈ Bridge Relief Expo Rehearsal
Deliverable 45m
πŸŒ‰ Bridge Relief Expo
Assessment 45m