Deliverable

🛠️ Revision Sprint for Pitch Board

Critical Thinking & Problem Solving Effective Communication Collaboration Academic Mindset CCSS.ELA-Literacy.SL.9-10.1 CCSS.ELA-Literacy.SL.11-12.1 VA:Pr5.1.6a VA:Cr2.3 VA:Cn10.1.8a Submission Required

Using gallery-walk notes, teams revise floor plans, signage, quiet-corner features, and advocacy language for their pitch board and prototype station. Students highlight changed sections in a second color, update labels, and check that every revision is backed by user feedback rather than preference. The period ends with a quick partner check to confirm the revised work is clearer, more inclusive, and ready for final-phase polishing.

Plan day
Day 17
Duration
45 min
Grouping
Small Group
Steps