Project Work

🧪 Prototype Build and Test Plan

PS.Chm.7.3 PS.Chm.7.2 PS.Chm.7.1 Submission Required

Teams build a low-fidelity warming-device prototype using foam, fabric scraps, plastic bags, tape, string, and reusable containers, then set up a simple cold-water test with thermometers, cups, and timed observations. They also outline the matching dive-plan draft pieces they will need on their board: air calculations, route map, checklist, and particle-model diagram. Each team records one testable claim about warmth and one safety claim about air use before testing begins.

Plan day
Day 11
Duration
75 min
Grouping
Small Group
Steps