Deliverable

πŸ” Iteration Log & Revision Plan

Critical Thinking & Problem Solving Collaboration VA:Cn11.1.8a VA:Cn10.1.8a Submission Required

Using feedback, teams complete an iteration log (Version 1 β†’ Feedback β†’ Change β†’ Why). They identify specific revisions (e.g., adjust symmetry for clarity, enlarge dome feature, simplify color palette for stronger contrast in watercolor resist). Each change must connect to user evidence and the team’s How Might We statement.

Plan day
Day 4
Duration
10 min
Grouping
Small Group
Steps
β€”